Product Information
The sheet metal shelves are assembled from uprights, beams and laminates. There are two pillars in an independent group. This is called the main rack. If multiple are combined into one column, the other group can be combined with the first group of two columns in addition to the first group. The preceding groups share a column. Such a rack is called a sub rack. If the rack needs to be moved frequently, it is recommended to use the main rack. The rack connected by the main rack and the sub rack must follow the main rack.
Features
The sheet metal shelves are beautiful in appearance, easy to disassemble, and can carry 100kg~350kg/layer. It adopts non-standard long-span bearings, which can be adjusted in 75mm pitch. It has a novel appearance, the beam and the column are connected by movable buckles. The height of each layer can be adjusted arbitrarily, and the non-standard can be customized according to requirements. The shelves are sturdy and durable, all metal parts of the shelves are rust-proof, and the appearance is electrostatically sprayed.
About us
As a ISO9001 certified sheet metal fabricator,Starway make things easier for you by offering one stop solution of sheet metal shelves. Powder coating is a standard finish for the custom shelves fabrication, as well as silk screening. The shelves can be made in various material, like steel, aluminum, stainless steel. The custom made shelves system can be used for display application or installation business. At Starway, with the support of responsive project team and factory, prototypes can be ready in days! just send us your drawings or even sketches for quick quote!
1. How long will the prototype takes?
The prototypes for steel machining parts usually takes around 5 days.
2. Is it possible to know how are my products going on without visiting your company?
detailed production schedule for your steel machining parts will be provided and send weekly reports with pictures or videos which show the whole machining progress.
3. How long does batch orders take?
-For batch orders, normally it takes 20 days.
4. How do you handle quality issue?
In 24 hours after receiving quality claim, 8D report will be provided and if necessary, replacement of such custom shelves fabrication part would be refuned.
Hot Tags: sheet metal shelves, China sheet metal shelves manufacturers, suppliers, factory, Sheet Metal Solutions, Stainless Steel Sheet Metal Fabrication, sheet metal shelves, Stamping Service, Sheet Metal Suppliers, Commercial Sheet Metal

















